Case Study 05

Bletchley: a hip put right.

Loose hip tiles and slipped cuts on a Bletchley home. The full hip line was rebedded in fresh mortar and the cut tiles resecured, so the ridge sits tight and sheds water the way it should.

Freshly rebedded hip line in new mortar with replacement cut tiles on a Bletchley roof Bletchley · 2026
01/Project brief
Project brief

A slipping hip is a small job that matters.

The owner had noticed the hip tiles starting to move and a couple of cut tiles slipping out of line. Left alone, that is exactly where a roof begins to let water in, so the fix was straightforward but worth doing properly: strip the loose bedding off the hip, rebed the whole line in fresh mortar, and resecure the cut tiles so nothing can work its way loose again.

  • DurationOne day
  • WorkHip rebedded
  • AlsoCut tiles resecured
02/Project specification
Specification

The specification.

Every line item, on the record.

Hip tiles being rebedded in fresh mortar on a Bletchley pitched roof Job No. 05 Case Study · BL
Project card

Bletchley Hip Re-Bed

One day on site · Rebedded hip, resecured cuts · Bletchley
01 The brief
ClientPrivate residential ownerLocationBletchley, Milton KeynesPropertyResidential pitched concrete tile roofDurationOne day on site
02 The work
Hip lineOld bedding stripped, hip tiles rebedded in fresh mortarCut tilesSlipped cuts resecured along the hipPointingFresh mortar struck and pointed to shed waterAccessScaffold tower and roof ladders, worked off the ridge
03 Sign-off
CheckRidge and adjoining courses checked while up thereRecordWritten photographic recordRecordWritten photographic record throughout
04/Work breakdown
Stage by stage

Four stages, from strip to struck pointing.

A hip only keeps water out if the bedding is sound and the cuts are held. The order of operations that put this one right.

Weathered hip line with slipped cut tiles and tired, cracked mortar bedding before the repairStage 01
01 Strip the bedding

Strip the tired bedding.

The old, cracked mortar bedding was raked and lifted off the hip line, and the hip tiles carefully set aside so we could start from a clean, sound course.

Hip tiles rebedded in fresh mortar, set straight and true along the hip lineStage 02
02 Rebed the hip

Rebed the hip in fresh mortar.

The full hip line was rebedded in fresh mortar, each hip tile set back down straight and true so the line runs clean from ridge to eaves.

Fresh mortar hip with the slipped cut tiles lifted, cleaned and resecuredStage 03
03 Resecure cuts

Resecure the cut tiles.

The slipped cut tiles running into the hip were lifted, cleaned and resecured, so there are no loose edges left to lift in the wind or let water track underneath.

The completed hip and ridge, struck and pointed, checked over before coming off the roofStage 04
04 Point and finish

Point and finish.

The fresh mortar was struck and pointed to throw water clear of the joint, and the ridge and adjoining courses checked over before we came off the roof.

05/Detail gallery
On site

The details that make the finish.

06/Craft note
Why bedding matters

Why a hip is worth doing properly.

A hip is one of those details that most people never think about until it starts to go. It is the line where two roof slopes meet, capped by hip tiles bedded in mortar, with cut tiles running into it on both sides. When the bedding cracks and the cuts slip, the hip stops shedding water and starts letting it in, usually showing up as damp in the room below long before anyone spots it on the roof.

The temptation is to smear a bit of fresh mortar over the cracks and call it done. That lasts a winter. Doing it properly means stripping the tired bedding right off, rebedding the whole hip line in one go so it is consistent, resecuring the cut tiles that have moved, and striking the pointing so water runs off the joint rather than sitting in it.

It is a one-day job when it is caught early. Left too long, a slipping hip turns into slipped tiles, water in the timbers, and a much bigger bill. This one was caught in good time and put right in a day.

"Booked it in, sorted in a day, no fuss."
Owner · Bletchley Hip Re-Bed · 2026
07/Materials used
What we used

Specified for the roof, not the trend.

Hover any material for the full spec.

Fresh mortar bedding 01
Bedding

Fresh mortar bedding

WhereFull hip line, ridge to eaves
FinishStruck and pointed to shed water
AdvantageConsistent, water-tight hip
Rebedded hip tiles 02
Capping

Rebedded hip tiles

WorkLifted, cleaned and reset straight
LineTrue from ridge to eaves
AdvantageNo loose caps to lift in the wind
Resecured cuts 03
Cut tiles

Resecured cuts

WorkSlipped cuts lifted and refixed
WhereBoth sides running into the hip
AdvantageNo open edges for water to track
Ridge and courses 04
Check

Ridge and courses

CheckRidge and adjoining courses inspected
ExtentWhile access was up
AdvantageSmall issues caught in the same visit
09 · The repair in full

The hip, from tired to true.

01 · The hip before
01 · The hip before
02 · Rebedding the hip
02 · Rebedding the hip
03 · Fresh mortar, resecured cuts
03 · Fresh mortar, resecured cuts
04 · Hip and ridge, complete
04 · Hip and ridge, complete